PMIS carries an organisation's projects from idea to closure: plans and schedules, people and their time, cost and contracts, documents and letters, meetings, daily site reports, knowledge, and the reports that decide. In Persian and English, on the Persian and the Gregorian calendar.

Built on Divan About PMIS

This is PMIS's own help, as it ships with the product, in the same four parts as Divan's Help. A marked word such as Gantt and WBS names a place in PMIS: inside the product, it opens there.

Where it speaks of the platform underneath - setup, sign-in, groups, email, what the server enforces - it describes PMIS on SharePoint. On Divan the same screens sign people in with Divan, keep their rows in Divan's datasets under rules Divan enforces, and hand approvals, help and courses to Divan's own apps (PMIS on Divan).

What it is for

What PMIS is for

For: Everyone

PMIS, Gantt and WBS: The working plan: table and chart side by side.
The real product - demo data

This system is where an organization carries its projects from idea to closure. It is an application that runs in the browser and keeps its data in the lists and libraries of a SharePoint site.

What it does

  • Planning and tracking: Gantt, baselines, critical path, progress reports and their approval. Gantt and WBS
  • People: resource pool, capacity, engagements and timesheets. Capacity
  • Control: risks, issues, change requests and delays. Risks and hazards
  • Money: budget, earned value, cash flow, contracts, payment statements and guarantees. Contracts
  • Documents and letters: registering, versions, review, classification, letters and transmittals. Documents
  • Decisions: reports, portfolio analysis and gates. Command centre

Who it is for

Project manager, planner, team member, PMO, executive, resource manager, contract officer, financial officer, document controller, meeting secretary, and contractor or consultant. Each person sees only what concerns their role.

Two things to know from the start

  1. The system has no separate server of its own. Calculations, reminders and approval flows run in users’ browsers. Some rules are applied by the application and only some by the server. See what the server enforces.
  2. The system grows with the project. A small project sees few tools, and tools appear as it grows.

The map of modules

For: Everyone

PMIS, Today: Decisions waiting, work due soon, today's meetings and your projects.
The real product - demo data
ModuleQuestionWhere
TodayWhat needs me now?Today
InboxWhat is waiting for my decision?Inbox
PortfoliosAre we doing the right things?Portfolios
ProjectsWhat state is each project in?Project list
ResourcesWho is booked how much?Resources
TasksWhat has been assigned to whom?Tasks
MeetingsWhen do we meet, and what was decided?Meetings
CommercialWhat are our commitments and payments?Commercial
DocumentsWhere is the document or letter?Documents
InsightsWhat is the overall trend?Insights
AdminHow is the system set up? (administrators only)Admin

“Portfolios” with no portfolio and “Resources” with no resource do not show for an ordinary user.

Project hub tabs

In each project: “Overview”, “Schedule”, “Control”, “Cost”, “Commercial”, “Documents”, “Plan and knowledge” and “Team”. Each tab appears with capabilities and your permission, and a project type can limit tabs per stage. Project hub

How the system adapts to a project

For: Project manager, PMO and system admin

PMIS, Project types: Default level, method, roles and plan per type.
The real product - demo data

There is one product and one data model. A few layers decide which tools a project sees.

Five levels

LevelForDemo sample
1 SimpleSmall group work: activity list, board, calendar, team, files“Annual Summit”
2 StandardDepartmental projects: Gantt, WBS, risks, issues, budget, meetings, correspondence, closure“Port study”, “Energy saving”
3 ProfessionalTypical projects: baselines, critical path, resources, timesheets, change control, EVM, contracts, charter“ERP rollout”
4 EnterpriseLarge projects: PM plan, gates, requirements, quality, RACI, leveling, Monte Carlo, cash flow, multi-currency“Power renewal”, “Central warehouse”
5 Mega (EPCMF)Subprojects, interfaces, submittals, MDR, punch list, financing“Production Line 2”

You change the level on the project form with “Complexity level”. The default is level 2. Going up loses nothing, and going down only hides, it does not delete.

Project type

A type gives the default level, delivery method (predictive, hybrid, agile), stages, needed roles and a ready plan. Ready types: Group activity, Internal improvement, IT and software, Study, R&D, Maintenance shutdown, Construction, EPC and EPCMF. An administrator can make new ones. Project types

Capabilities that appear by themselves

Some capabilities turn on without a level change:

  • Gantt: at 8 activities or the first link
  • WBS: at 30 activities or the first outline
  • Risks, issues, meetings, correspondence, stakeholders, contracts and statements: with the first record
  • Baselines: with the first baseline. EVM: with a baseline and activity cost
  • Resources: at 3 assignees. Leveling: when someone is over-allocated
  • Cash flow and vendor evaluation: with the first contract
  • Agile: when the delivery method is not predictive

Order of decision

Organization policy beats everything, then project type, level and automatic reveal. An administrator can turn automatic reveal off or change the level table. Each user can turn on “Show every tool to me”. Complexity levels

The limit of this

A hidden tool means the page does not show it. It is not a security boundary.

Getting started

A project manager's first day

For: Project manager

PMIS, New project: Start by type, by copying, or from a plan file.
The real product - demo data

You can first see these steps on “Central Warehouse” in the demo.

  1. Create the project. Press “New project” and choose the type. New project
  2. Form the team. Under “Team” add members and give roles. Team
  3. Build the plan. Write activities in the Gantt, or import from Excel or project XML. Gantt and WBS
  4. Give links and resources. Set dependencies and give each activity an assignee. Link
  5. Capture a baseline. After approval, save baseline zero. Baselines
  6. Set the status manager. Decide who approves each activity’s progress.
  7. Record risks. Write down the main risks. Risks and hazards

Each week

Approve updates in the Inbox, see the “Delay report”, and send the weekly report. Status reports

A team member's first day

For: Team member

  1. Open “Today”. Your work due soon and your meetings are here. Today
  2. See Display settings. Choose language, calendar and theme. Display settings
  3. See the Inbox. Approvals and things asked of you. Inbox
  4. Report progress. “Projects”, “My updates”. My task updates
  5. File your time. “Resources”, “Timesheets”, “My timesheet”. My timesheet
  6. See Tasks. Work given to you outside a project’s plan. Tasks
  7. Remember Ctrl+K. It finds anything. Search and commands

If you do not see something

  • If a message says your account is not linked to a resource, ask a manager to link you in the pool.
  • A project is missing: you must be on its team or have a task on it.
  • Email reminders come only when an administrator has turned email on. See in-app notifications on the bell at the top. Notifications

An administrator's first hour

For: System admin

PMIS, Set up PMIS: Create the lists, libraries and groups on this site.
The real product - demo data
  1. Run setup. Open the system with a site collection admin account and press “Start setup”. Lists, libraries, PMIS groups and reference data are created. Setup
  2. Check health. Under “Settings”, “System health” the schema should be complete. Project Server and online Office are not needed, and the system says what it uses. System health
  3. Add people to groups. In SharePoint put people in groups such as “PMIS Project Managers” and “PMIS Members”. Someone with no group gets the member role. Groups and roles
  4. Build the organization. Add units under “Organization”. Organization
  5. Give the calendar and currency. A work calendar with holidays, the base currency and rates. Work calendars and Currency settings
  6. Review levels and types. See the default level and the project types. Complexity levels
  7. Read about security. Read “Soft and hard” and know what the server does not enforce. Soft and hard
  8. Create demo data so the team can practise on it. Demo mode

After this hour

To confirm the server boundary, check with a non-admin account that a classified library is closed. Put no classified content in before then.

Demo mode and demo data

For: System admin, trainer and presenter

PMIS, Demo mode and data: Load sample data and see the system as any role.
The real product - demo data

Demo data

“Settings”, “Demo mode and data”, “Create demo data”. All the guides in this pack are written on this data. Demo mode

ProjectLevelType
“Production Line 2”5EPCMF
“Power renewal”4Construction
“ERP rollout”3IT and software, hybrid
“Port study”2Study
“Central warehouse”4Construction
“Energy saving”2Internal improvement, in planning
“Annual Summit”1Group task

With it come “Avaye Sepehr Industrial Group” with four business units and six plants, the portfolio “Development plans 2026” with two programs, strategic drivers, parties such as “Arman Sazeh Contracting” and “Pars Tarh Consulting Engineers”, contracts, statements, guarantees, meetings, documents, letters and a portfolio analysis.

What to know

  • Work is given only to the person who creates the data, meaning you. No message goes to anyone else, no email is sent, and every approval step on a demo record comes back to the person at the keyboard.
  • All records carry the demo tag, and “Remove demo data” deletes exactly those. Anything you make under a demo project or record, or in demo mode, gets this tag too. Outside demo mode, a record with no project and no demo parent stays real.
  • By the default setting, demo projects are visible to all users of the system. To hide them, turn that setting off in the security part of general settings.
  • Record numbers and ids change each time the data is built.

Demo mode

Choose “Organization role”, if needed “Project role” and “See through a person”, and press “Enter demo mode”. The top strip says which role you are in. Real projects are read-only and every action is recorded under your real name. “Today”, “Inbox”, my work, the “mine” tabs in Tasks and the bell show the sample work of whoever loaded the data, whatever the role, sample rows only. It ends after four hours or when the browser session closes. Demo bar

Tasks

The Today page

For: Everyone

When you need it

The first page you see each day.

Steps

  1. Open “Today”.
  2. Read the numbers at the top: “Decisions waiting”, “Work due soon” and “Meetings today”.
  3. Go to each item from “My work” and “Today’s meetings”. “Status requests you owe” shows unanswered requests.
  4. “Favourites and recent” are shortcuts, and “My projects” are those you manage.

What you should see

If you have no project yet, “New project”, “Import a plan”, “Suggest an idea” and “Browse projects” appear.

What can go wrong

  • The numbers come from your own inbox and tasks, not the whole organization.
  • Today
  • Inbox

Inbox: approve, reject, return and delegate

For: Every approver

PMIS, Inbox: All your approvals and actions in one queue.
The real product - demo data

When you need it

Whenever the badge beside “Inbox” shows a number.

Steps

  1. Open “Inbox”. “Waiting for me”, “Sent by me” and “Done” are the three views.
  2. Open an item. Tabs: “Summary”, “Effect on the plan”, “Approval” and “Files”.
  3. On an activity update, “Effect on the plan” says how many days the project finish moves and which activities are affected.
  4. Change “Values you can correct” if needed.
  5. Press one of “Approve”, “Reject”, “Return for changes” or “Delegate”. Write a comment.
  6. For several, select them and press “Approve all”. They are approved with their values unchanged.

What you should see

On final approval the item’s effect runs: the plan updates, a project is created, or a cost is posted. The approval thread shows each action with name and time.

What can go wrong

  • “This item has already been handled.”: someone else decided.
  • The preview is not available: no plan is recorded, or it lives outside the system.
  • The inbox refreshes itself every two minutes, not instantly.
  • Inbox
  • Approval rules
  • Status requests

From idea to charter and project

For: Project manager, PMO and sponsor

PMIS, Pipeline: From idea to charter, ending in automatic project creation.
The real product - demo data

When you need it

When a project must be approved before it starts.

Steps

  1. Under “Projects” press “Pipeline”. The tabs are “Ideas”, “Charters”, “Approved AOP” and “Charter settings”.
  2. Under “Ideas” open “solar power for own use”, or make a “New idea”. “Print” gives the “Idea profile” form.
  3. On an approved idea press “Create charter” and choose the type: “Study charter”, “Investment charter”, “Construction charter” or “Contractor charter”.
  4. For a charter with no idea, press “New” under “Charters” and choose the type from that menu. “Another type of charter” is for a type your organization added.
  5. Complete the charter: “Objectives”, “General requirements”, “Deliverables”, “High-level risks”, “Key milestones”, “Phases”, “Key stakeholders”, “Permit authorities” and “Required resources”.
  6. Press “Send for approval”. The default flow passes the sponsor, the PMO and the steering committee.
  7. For the annual list, complete “CAPEX approved” and “AOP year” on the charter and see “Approved AOP”.
  8. “Charter settings” leads to “Charter approvers”, “Charter types and idea origins”, “Numbering” and “Fields and forms”.

What you should see

“Form code” and the charter’s code are automatic, and each charter type has its own counter. After final approval the project is created automatically, and the charter’s rows become deliverables, risks, stakeholders, requirements, permits, milestones and activities. “Open project” opens it. The charter list has “All”, “Mine”, “Waiting” and “Archive”.

What can go wrong

  • The new project takes the organization’s default type. With no default type, it has no type.
  • If the project was not created, an approved charter has “Create project”.
  • An approved charter is locked and changes only through “Request a charter change”.
  • A charter has a printed version, but its signing happens outside the system.
  • Pipeline
  • Charters
  • Charter settings
  • Approved AOP
  • Inbox

Create a new project

For: Project manager and PMO

When you need it

When a piece of work should be tracked as a project and does not need the idea and charter route.

Steps

  1. In “Projects”, press “New project”.
  2. Choose the type. It sets the default level, delivery method and first stage. A type with a ready plan is marked “with a plan”.
  3. If nothing fits, press “No type”. For a similar project choose “Copy a project”. For an existing plan choose “From a plan file”.
  4. Fill in the form and save. The project manager defaults to you.

What you should see

The project hub opens on its overview. Its tabs follow its level: a level 1 project has only a list of tasks.

What can go wrong

  • You do not see the button: creating a project needs the create right in the project family.
  • A type is missing: a type limited to certain departments shows only to people in them, and an inactive type is not shown.
  • New project
  • Plan file
  • Project types

Build and edit a plan in the Gantt

For: Planner and project manager

When you need it

When you build or change a project’s plan.

Steps

  1. In “Power Facility Renewal” go to “Schedule”, “Gantt and WBS”. Your first change checks the plan out to you.
  2. On the toolbar press “Activity”, “Milestone” or “Summary”. “Summary” wraps the selected rows in a summary activity.
  3. Write values in the table: “Name”, “Days”, “Start”, “Preds” and “Resources”.
  4. Build the outline with “Indent” and “Outdent”.
  5. Drag a bar to move it, its finish edge for duration, and its lower triangle for progress.
  6. “Recurring activity” makes several activities from a daily, weekly, monthly or yearly pattern.

What you should see

Changes save by themselves and you see “Saving”. “Undo” and “Redo” are on the toolbar. You can copy from Excel and paste into the table.

What can go wrong

  • Calculated columns do not edit: “A summary takes this from its children”.
  • “This plan is read-only here”: you lack the right to edit the plan, or someone else has it.
  • Activities schedule in days. The hour view is only a reading aid.
  • On a phone the table and chart do not fit together. Use the “List” and “Chart” switch. The table shows a few main columns there.
  • The plan of a project connected to Project Server is read-only here, and a band above it says so.
  • Gantt and WBS
  • Gantt tools
  • Check a plan out and in

For: Planner

PMIS, Link selected rows: Join the selected rows with dependencies.
The real product - demo data

When you need it

When the order of work matters and you want to know what sets the project finish.

Steps

  1. Select two rows and press “Link selected rows”, or drag a bar’s circle onto another bar.
  2. You can also type in “Preds”, for example 12FS+2 or 15SS. The numbers are from the “ID” column.
  3. Set a constraint in “Constraint” and “Constraint date”, and a due date in “Deadline”.
  4. Turn on “Critical only” and see “Show slack”.
  5. Select a row and open “Activity Inspector: why this date?”.
  6. For a manual activity press “Switch auto or manual”.

What you should see

The Inspector says in plain words which link, constraint or calendar set the start, and offers “Remove constraint” and “Switch to auto”. A critical activity is red with a flame mark.

What can go wrong

  • “This link would create a circular dependency”: the link is refused.
  • An activity cannot link to its own parent or child.
  • “A constraint conflicts with the links”: the setting “Constraints take priority over links” decides which wins.
  • A manual activity keeps the date typed for it and does not move in the calculation.
  • Link
  • Activity Inspector
  • Critical only
  • Network diagram

Save and compare baselines

For: Project manager and planner

PMIS, Baselines: Every saved baseline and interim plan, with Copy onto.
The real product - demo data

When you need it

After a plan is approved, and whenever a change is approved.

Steps

  1. In the Gantt open “Baselines and interim plans”.
  2. Choose “Baseline” or “Interim plan” and give the “Number”.
  3. Under “For” choose “Entire project” or “Selected activities”. For selected activities you can tick “Roll up to the summary activities above”.
  4. Press “Capture”.
  5. Turn on “Show baseline” and use “Tracking Gantt” and the variance columns.

What you should see

Baseline 0 is the yardstick for progress and earned value, unless the project chose another. The full list is under “Schedule”, “Baselines”.

What can go wrong

  • “Baselines 0 to 5 are protected”: saving or clearing them takes approval rights. You can use 6 to 10.
  • An interim plan keeps only start and finish.
  • “Replace it” destroys the earlier baseline with that number.
  • In the “Captured” list each baseline has “Copy onto…”, which writes it onto another number. Only numbers you may use appear, and a number in use says “replaced”. “Clear” frees a number, and with the selected-rows scope “Clear selected” appears too.
  • Baselines
  • Tracking Gantt
  • Compare plans

Report progress on my activities

For: Team member

PMIS, My task updates: Record work done, see approved and current progress, and send it for approval.
The real product - demo data

When you need it

Whenever you have worked on your activities and need to report progress.

Steps

  1. In “Projects”, press “My updates”. The page has the tabs “My activities” and “Issues and risks”, and “Waiting for my approval” joins them if anything is waiting for you.
  2. Pick a range with “Active”, “Near future”, “Future”, “Completed”, “Not updated” and “All”. “Activity tree” places rows under their summary activities, and “Depth shown” sets how deep.
  3. On an activity’s row enter ”% work”, “Actual work (h)”, “Remaining (h)”, “Actual start”, “Actual finish” and “Actual cost”. The columns you see depend on the organization’s tracking method.
  4. Select rows and press “Send for approval”. On a project with no progress approval at its level (below level 3 by default) the button says “Save” and the values go straight into the plan. In the window you can add a comment and “Attach files”. When several rows are sent, a small bar says how far the work has come.
  5. Selected rows also offer “Comment for the team”, “History”, “Risk”, “Issue” and “Delay reason”. If the organization allows it, “Reassign” and “Add me to an activity” appear too.

What you should see

On a project with approvals, the tiles at the top show the gap between the plan and what you typed: “Approved progress” and “Approved cost” are what the plan holds, and “Current progress” and “Current cost” add what is in approval and what you have not sent. The “Waiting for” and “Last action” columns say who has the row.

Unsent entries, labelled “Unsent”, stay in this browser. “Revert changes” clears them, and the recorded values come back. After sending, a row cannot be edited until approval ends or it is returned, but others on the same activity can still report.

What can go wrong

  • “Your account is not linked to a resource”: a manager must link you in the pool.
  • “Actual finish cannot be in the future” and “Actual start cannot be after actual finish” are input errors.
  • “Here, progress comes from timesheet hours”: log the hours in “My timesheet”. Only dates can be edited on this page.
  • “Current cost” holds typed figures only, and hours are priced once approved.
  • “Comment for the team” is not an update and needs no approval. Everyone who can see the activity sees it under its comments.
  • A draft lives only in this browser and does not follow you to another computer.
  • Custom field columns appear when an administrator turns them on under “Custom fields on status updates”.
  • My activity updates
  • My issues and risks
  • My timesheet

Approve activity updates

For: Status manager, project manager and PMO

PMIS, Waiting for my approval: Every progress update waiting for you, in one table. Correct and decide here.
The real product - demo data

When you need it

When a team member has sent progress, and it must be checked before it touches the plan.

Steps

  1. In “Projects” open “My updates” and go to the “Waiting for my approval” tab. Every update waiting for you is in one table. In the demo, “ERP rollout” has one.
  2. Narrow the rows with the table’s filters and “Activity level”. If you are an administrator or PMO, “All” shows what waits for others too.
  3. Where the step allows it, correct figures and dates in the row. For several rows press “Edit all selected”. Nothing is recorded until you approve.
  4. Press “Approve”, “Return” or “Reject”. Return and reject need a reason.
  5. To see files and the thread, open the row in the “Inbox”.
  6. To name approvers, on the project go to “Schedule”, “Activity status” and press “Activity approvers”: “Level 1” to “Level 4” for each activity, or “No approval”. Select several activities to put one person on all of them.

What you should see

On final approval, progress and dates reach the activity, the plan recalculates and the project’s indicators refresh. On reject or return the activity opens for reporting again, unless someone has closed it.

What can go wrong

  • “Level 1” is the activity’s status manager, and empty means the project manager. Levels 2 to 4 apply only to assignment updates. An activity with no assignment follows the general route: status manager, senior manager (optional) and PMO. You can change that in “Workflows”.
  • With “No approval” a report goes straight into the plan, and stays in the log.
  • If an item reaches nobody, the step falls back to the system administrators.
  • An automatic approval rule can accept some updates without you.
  • “None of these rows are waiting for you.”: in the “All” view you can decide only your own rows.
  • The workflow lock is a rule of the application, not a server boundary.
  • Waiting for my approval
  • Inbox
  • Activity status
  • Approval rules

Recording risks and hazards and responding to them

For: Project manager, planner and team member

PMIS, Risks: Threats and opportunities with a response plan.
The real product - demo data

When you need it

When something may change the plan or the cost, or there is a danger to people and equipment.

Steps

  1. On “production line 2” go to “Control”, “Risks”.
  2. Read the tiles: “Open risks”, “Critical risks” (score 15 and above) and “Suggested contingency” (cost times probability).
  3. Click a cell of the “Risk heat map” to filter the list.
  4. Press “New risk”. Fill in “Kind”, probability (1 to 5), impact (1 to 5), owner and response strategy.
  5. Open the risk “exchange rate swings in purchase contracts” and add an action with an owner and due date on the “Actions” tab.
  6. For safety dangers go to “Control”, “Hazards” and press “New hazard”. This page has its own “Hazard heat map” and “Open hazards”.

What you should see

Open means “Open” or “Responding”, on every page and in the figure at the top of the project. “Postponed”, “Occurred” and “Closed” are counted apart. A postponed row can carry a “Return date”, when its owner gets a reminder. An action’s owner is notified when given it, on the reminder days and once past its date. “Score” comes from probability and impact. The “Exposure” column is the cost if it happens, times probability, divided by 5. Hazards do not appear on “Risks”, and risks do not appear on “Hazards”.

What can go wrong

  • A team member can only create and read risks. Editing and deleting need a higher role.
  • The cost if it happens is in base currency. This field does not show without the budget capability.
  • Risks
  • Hazards
  • Risk heat map
  • Schedule risk

Change requests and baseline update

For: Project manager and PMO

PMIS, Changes: Change requests with their impact, approval and follow-ups.
The real product - demo data

When you need it

When something in the approved scope, time or cost must change.

Steps

  1. On “production line 2” go to “Control”, “Changes”. The sample “add a packaging line to scope” is there.
  2. Press “New change”. Fill in “Kind”, “Description”, “Reason”, “Schedule impact (days)”, “Cost impact”, “Quality impact” and “Scope impact”.
  3. Under “Effect on each area and its follow-up”, mark the affected areas with an owner and due date.
  4. “Update baseline after approval” is on by default. Turn it off if the plan must not change.
  5. Press “Send for approval”. The flow passes the PMO and the project manager, and also the steering committee if there is a time or cost impact.

What you should see

After final approval, “Cost impact” is added to the project’s budget, and a project with CBS lines also gets a new line with the request’s number. “Schedule impact (days)” moves no date: the project manager gets a follow-up task to correct the plan. With the baseline option and a schedule impact, the baseline waits until “Applied to the plan” is confirmed. With no schedule impact, the plan is recalculated and a new baseline is captured from it as it stands, shown in “Baseline created”. The “Follow-ups” tab shows what the change left behind.

What can go wrong

  • Changing the plan’s activities is not automatic. If the request has a schedule impact, after final approval correct the plan in the Gantt and confirm “Applied to the plan” on the request, and the baseline is taken from the corrected plan. A request with no schedule impact takes its baseline at once.
  • This page’s tab shows from level 3 or after the first request.
  • In the menu by PMBOK heading this page is called “Change control”.
  • A change request can also be raised from an RFI, and brings its impacts with it.
  • Changes
  • Change follow-ups
  • Baselines
  • Inbox

The capacity map

For: Resource manager and project manager

PMIS, Capacity: Load against capacity, capacity and demand, and assignments over time.
The real product - demo data

When you need it

Before taking a new promise from someone, or in a monthly resource review.

Steps

  1. Open “Resources”, “Capacity”.
  2. Choose the period with “Week”, “Month” or “Fiscal”, and move with “Previous range” and “Next range”. “People” or “Roles” sets the rows.
  3. Change “Include approved engagements” and “Include proposed bookings” if needed. The first starts on and the second off, and the same choice and range hold on the “Over-allocation” page. The line under the cards says what is counted. The cards count people only.
  4. Narrow with “Org unit”, “Role” and search. “Only over-allocated” and “Only under 50%” are shortcuts.
  5. Choose one of three views: “Heat map”, “Capacity and demand” or “Assignments over time”.
  6. “Save this filter” names the filters, and “Saved filters…” brings them back. The trash button beside the list deletes the chosen filter. A resource no longer in the pool is left out, and its count is shown.

What you should see

In “Heat map” each cell is the percent of load against capacity in that period, with a legend: “Free”, “Under 50%”, “50 to 79%”, “80 to 100%” and “Over capacity”. Click a cell to see the assignments behind it.

“Capacity and demand” gives “Capacity”, “Demand” and “Gap” in hours for each period, for the resources in this filter. A generic role adds demand and no capacity, so what is asked for and not staffed shows up. “Assignments over time” gives each assignment’s planned hours per period, across projects. Click a resource to open it. “Export CSV” gives the table.

What can go wrong

  • “Generic demand, no capacity”: the plan needs a role nobody holds.
  • “No fiscal period reaches this range”: columns fall back to months. Create the fiscal periods.
  • If you came from “Capacity of these” in the pool, only those resources show. “All resources” removes that limit.
  • The calculation runs in the browser, so a big pool takes time.
  • Capacity
  • Resource pool
  • Over-allocation list

File a timesheet

For: Team member

PMIS, My timesheet: Enter your hours and submit them.
The real product - demo data

When you need it

At the end of each reporting period, usually weekly.

Steps

  1. Open “Resources”, “Timesheets”, “My timesheet”. A team member lands here directly.
  2. Pick the period with “Previous period”, “Next period” or “Go to date”.
  3. Press “Add all activities” or use “Suggested activities this period”. For leave and the like press “Add administrative time”.
  4. Write the hours in the cells. Make another row for a class such as overtime or mission. You can write a comment under each row’s name.
  5. For a meeting use “Meeting time”. The list holds only meetings you were invited to or attended, each with its date. If the organization allows it, “Time on a project”, “Time on a summary activity” and “Personal task” are there too.
  6. Press “Save draft” and then “Submit”. If asked, choose the approver.

What you should see

After approval the hours are recorded as actual work. “Recall” brings back a sent timesheet.

What can go wrong

  • “Your account is not linked to a resource”: a manager must link you in the pool.
  • “This reporting period is closed”: the period must be reopened.
  • “above the limit” and “below the minimum”: this is the organization’s timesheet policy.
  • Administrative time, meeting time, time on a project or summary activity and personal activities are recorded but are not added to any activity’s actual work. A message above the table says how many hours that is.
  • Hours in the mission class go to the activity’s actual work, as regular hours do.
  • My timesheet
  • Timesheet reports

A project's budget by CBS

For: Project manager and financial officer

PMIS, Project budget: Budget lines by CBS and currency.
The real product - demo data

When you need it

When a project’s budget must be broken down into parts and work packages. For the organization’s annual plan, its approval and allocation, use “Budget” in the side rail.

Steps

  1. In “Production Line 2” go to “Cost”, “Budget”. The lines “Construction and installation” and “Engineering” are samples.
  2. Press “Budget line”. Fill “CBS code”, “Work package”, “Currency” and “Approved budget”. “Allocation estimate” and “Forecast at completion” are typed by hand too. “Final budget allocation” and “On activities, not posted” are worked out, and a message above the table says when the lines do not add up to the project’s budget.
  3. Compare the “Committed” and “Actual” columns with the budget.

What you should see

“Committed” comes from contracts linked to the line and “Actual” from recorded costs, stored in the base currency. A plan line in the “Budget” module can be tied to this CBS line, and reads commitment and cost from it and everything beneath it.

What can go wrong

  • A contract with no rate does not count in the commitment. It is not taken at a rate of 1.
  • Budget lines do not add up into the project record’s “Budget” by themselves. The two are kept separately.
  • Without finance read, the “Cost” tab does not show.
  • Project budget
  • Budget plans
  • Contracts

Read earned value on a project

For: Project manager and financial officer

PMIS, Earned value: SPI, CPI and estimates at completion.
The real product - demo data

When you need it

To answer the question: at this pace, when and at what cost will the project finish?

Steps

  1. In “ERP rollout” go to “Cost”, “Earned value”.
  2. Read the tiles: SPI (“Schedule performance”), CPI (“Cost performance”), “Budget at completion”, “Planned value”, “Earned value”, “Actual cost”, “Estimate at completion”, “Estimate to complete”, “Variance at completion” and “To-complete index”.
  3. Compare plan and earned value on the chart.

What you should see

SPI is earned value divided by planned value, and CPI is earned value divided by actual cost. Actual cost is every row in the cost ledger once, plus what activities hold beyond the rows that name them, up to the status date. The note under the tiles gives the two parts. Below 1 means behind plan or over budget. Both are below 1 on this demo project.

What can go wrong

  • “Activity planned costs are not recorded”: SPI uses weights, and money indicators stay empty.
  • This calculation needs a baseline. Without one the earned value capability does not unlock on low levels.
  • The header’s indicators are stored numbers. If they look old, press “Recalculate indicators”.
  • Earned value
  • Earned value view
  • Earned value in Insights

A contract and its parts

For: Contract officer

PMIS, Contracts: Every contract. Open one for its tabs.
The real product - demo data

When you need it

From draft to the end of a contract.

Steps

  1. Open “Commercial”, “Contracts” and open “central warehouse shed”. A new contract comes from “New contract” or from “Templates”.
  2. In its details, the “Financial” section holds the deduction percentages, and “Coefficients and price adjustment” the pricing rules.
  3. “Financial” tab: “Current amount”, “Approved statements”, “Paid” and “Left on the contract”, with a plan and realized chart.
  4. “Services (BOQ)”: “New line” or “Add from a price list”.
  5. “Payment phases”: “New phase” and “Build cash plan from phases”.
  6. “Progress (MTS)”: “Report progress”. The other tabs are “Statements”, “Amendments”, “Closure”, “Checklist”, “Versions”, “Guarantees” and “Restricted”.
  7. Send the contract for approval: legal, finance and executive.

What you should see

After approval the contract’s status becomes “Approved, not yet exchanged”, version 1 is made, and the linked budget line’s commitment refreshes. “Print” gives the contract sheet. Limit the list with “All”, “Running”, “Ended” and “Archived”.

What can go wrong

  • “Restricted”: “You do not have access to this section. The server enforces this restriction.” It is the one part of a contract the server protects.
  • A contract with no rate stays out of budget commitments.
  • If the contract’s budget line has a “Hard ceiling” in an approved plan and the contract goes past it, approval is refused.
  • After approval, amount and duration change only through an amendment.
  • Contracts
  • Restricted section
  • Payment phases
  • Contract status and ending

Payment statements

For: Contractor, supervisor, technical office and finance

PMIS, Statements: Payment statements and their approval.
The real product - demo data

When you need it

At the end of each work period of a contract.

Steps

  1. On the contract open the “Statements” tab and press “New statement”, “Final statement” or “Invoice”, or choose the contract under “Commercial”, “Statements”.
  2. On the “Sheet” choose one of two ways: “By quantity” or “By percent to date”.
  3. For all lines together, give a percent in “All lines up to” and press “Apply”. If lines are tied to activities, “Fill from activity progress” works the quantity out from percent complete. “Link to activity” on the contract’s “Services (BOQ)” tab makes the link, even after approval. Check it before sending.
  4. For a detailed calculation press “Measurement sheet” on a line: “Pieces”, “Length”, “Width”, “Height” and “Factor”, and “Deduct” for openings. Then press “Save and use this quantity”.
  5. See “Deductions” and “Additions” under “Net calculation”. The columns are “This statement”, “Previous” and “To date”.
  6. Press “Send for approval”: supervisor, technical office and finance.
  7. “Print sheet” and “Print measurements” are the printed copies.

What you should see

The net comes from the strongest amount there is: technical approved, then supervisor approved, then claimed. The “Paid” tile shows any difference as “Mismatch”. Final approval posts the actual cost.

What can go wrong

  • “The quantity was outside what the contract allows, and was held at the limit.”
  • A line with a measurement sheet takes its quantity from that sheet, and cannot be changed by hand or by percent.
  • “No service lines on this contract”: you can enter the amount directly.
  • A closed contract takes no new statements.
  • A statement in another currency with no rate is not approved.
  • If the “Previous” column includes a statement not yet approved, a message says it may change.
  • Statements
  • Payments
  • Measurement sheet

Register documents

For: Team member and document controller

When you need it

To register one file or many.

Steps

  1. Drop the files on the page, or press “Register”. The current project, type and unit filter carries onto the files.
  2. In the “Register documents” table fill “Title”, “Type”, “Project”, “Unit”, “Level”, “Keywords” and “Date”. If disciplines are defined there is a “Discipline” column too, and the type’s required fields appear under the row. “Apply to all” gives a value to every row.
  3. The “Code (optional)” column is for a document whose number is already known. Left empty, one is assigned automatically.
  4. For pictures turn on “Reduce noise and size of images”, or press “Capture with camera”.
  5. Press the register button. “Register, skipping duplicates” leaves duplicate files out.

What you should see

The “State” column shows the stages: “Fingerprinting…”, “Uploading”, “Saving details”, “Extracting text” and “Registered”. The number comes from the numbering pattern. A document’s pattern in “Settings” can use, beside the general tokens, {DISC} (the discipline code) and {UNITPATH} (the unit’s code path from the top of the tree, such as HQ-ENG-PIP). Left empty, they drop out of the code with one separator.

What can go wrong

  • “Each row needs a title, a document type, and the fields that type requires.”
  • A code already in use is refused: type another, or leave it empty.
  • “Already registered:” this same file was registered before. “Register anyway” is possible.
  • “Browsers cannot drive a TWAIN scanner”: import the scanned file.
  • “Only the levels you are cleared for are offered.”
  • Upload and text extraction happen in the browser. Do not close the tab until they finish.
  • Register document
  • Create from template

Review cycle and document approval

For: Expert reviewer and document controller

When you need it

Before final approval of technical documents.

Steps

  1. On the document open the “Review” tab and press “Start a review cycle”. Give “Expert reviewers” and “Due”.
  2. Each expert writes with “New expert comment”: a category, a severity (major, minor or reminder) and “Page or clause”.
  3. The expert sets “My result”: “Approve”, “Approve with comments” or “Needs rework”.
  4. The document’s owner writes “Respond”: accepted, partly accepted, rejected or closed. To discuss under a comment, press “Reply in thread”.
  5. “Outcome…” closes the cycle, and the “Comment resolution matrix” prints, with its thread replies.
  6. “Send for approval” starts the flow: expert and document control.

What you should see

After final approval the document locks, and a change takes a new revision.

What can go wrong

  • “A cycle is already open. Close it first.”
  • Reviewers need clearance for the same classification level.
  • Review and comments
  • Inbox

Correspondence: register, route and reply

For: Secretariat and everyone

PMIS, Correspondence: Incoming, outgoing and internal letters.
The real product - demo data

When you need it

For every formal project letter.

Steps

  1. Open “Documents”, “Correspondence”. Views: “All letters”, “Incoming”, “Outgoing”, “Internal”, “Routed to me”, “Awaiting reply”, “Overdue” and “Closed”.
  2. Press “New letter”. Fill in “Direction”, “Template”, “Subject”, sender, recipient, “Cc”, “Reply due”, “Project”, “Contract” and “Letter body”.
  3. Press “Register letter”. Drafts save automatically.
  4. To route press “New routing”: “To”, “Instruction” and “Due”. The recipient presses “Seen”, “Done” or “Route onward”.
  5. “Re” or “Fwd” makes a new letter tied to the original.

What you should see

The number comes from the numbering pattern. Replies and forwards show as a chain. “Print” gives the letter sheet.

What can go wrong

  • “You are not cleared to read this letter”: a classified letter is stored in that level’s library.
  • The system does not send a letter by email. It only registers and prints it.
  • Ready templates hold formal text, and “Save as a template” makes your own.
  • Correspondence
  • New letter

Hold a meeting: agenda and minutes

For: Meeting secretary and chair

PMIS, Meeting: One meeting's details, decisions, approval and files. Open one from the list.
The real product - demo data

When you need it

From the day before the meeting to its end.

Steps

  1. Open the meeting, such as “weekly progress meeting”.
  2. On the “Agenda” tab set the agenda with “Add topic”: “Topic”, “Presenter” and “Min”. Press “Save”.
  3. In the meeting mark those there with “Present” on the “Attendees” card, then press “Mark as held”.
  4. On the “Minutes” tab write the minutes text and add the decisions.
  5. Press “Submit minutes” to send them to the chair for approval. If the meeting has no chair, there is no approval: the minutes are final and the decisions’ tasks are made. If the chair returns them, “Send minutes again” appears.
  6. There are three buttons to print: “Agenda”, “Minutes” and “Print details”.

What you should see

The printed minutes have “Present”, “Absent” and “External guests”. “Print details” also brings each person’s response, “Informed”, “Requirements” and “Notices on record”. When the minutes are approved, decisions with an owner become tasks, and the informed hear of it.

What can go wrong

  • The chair, the secretary, whoever made the meeting, a site collection administrator and the Meeting Secretary role can edit it.
  • “Cancel meeting” asks for a reason, frees the room and tells invitees why. “Back to draft” undoes it.
  • Once sent for approval, the minutes, agenda and decisions are locked.
  • Someone added to “Invitees” after the invitations go gets an invitation and appears on the attendance list.
  • The “Join online” link shows only when one was recorded in the details.
  • Printing uses the browser’s print window.
  • Meeting
  • Meetings list

The daily site report

For: Site supervisor and project manager

PMIS, Daily reports: Each project's daily site reports, with Mine, Waiting for my approval and All.
The real product - demo data

When you need it

At the end of each working day on site.

Steps

  1. Open “Daily reports” in the side rail. Demo data has reports for “Production Line 2” and “power facilities renewal”.
  2. Press “New report”, or “Copy from the previous report”, which brings the site, unit, addressee, informed list and all rows except incidents, and leaves today’s figures empty.
  3. In “Details” give “Project”, “Report date”, “Site”, “Addressee”, “Weather”, “Effect of weather on work” and the temperatures.
  4. Fill the tabs: “Activities”, “Manpower”, “Equipment”, “Materials”, “Problems”, “Safety incidents” and “Photos and files”. If there was no incident, tick “No incident today”.
  5. Press “Save” and then “Send for approval”: the report’s addressee (if not the project manager) and the project manager.
  6. “Print” gives the report sheet. “Copy to next day” makes the next day’s draft.

What you should see

“Total man-days” is worked out under the manpower table. Stock today comes from stock brought forward, volume in and used. On a copy, activity progress and material stock carry forward. Limit the list with “Mine”, “Waiting for my approval” and “All”, and with filters for project, addressee, unit and date. After final approval the “Informed” people are notified, and the “Notification log” tab shows who has been reached.

What can go wrong

  • “No project uses daily reports yet”: this tool is available from the Professional level up. Change the project’s level, or turn it on in the level matrix.
  • “Send with these gaps?”: gaps do not stop sending, but they show as a dash or as incomplete in the monthly totals.
  • A project and date can have several reports, and a message warns you. Monthly totals add them all.
  • Progress is recorded on this report only. It does not change the project plan.
  • Material stock is not warehouse stock. It comes only from these reports.
  • An approved report is locked, and a rejected one can no longer be edited: copy it.
  • Daily reports
  • Monthly totals

Finding and writing a knowledge article

For: All experts and area owners

PMIS, Knowledge home: One search over articles, questions and lessons, with what is waiting for you.
The real product - demo data

When you need it

When you want an answer to something, or what you know should stay for others.

Steps

  1. Open “Knowledge” in the side rail. Its tabs are the home page, “Articles”, “Questions”, “Areas”, “Experts”, “Lessons” and “My knowledge”. The rest is under “More”.
  2. Type in “Search knowledge”. Results come from articles, questions and lessons. “a weld inspection guide” is a sample article.
  3. Press “New article”. Give “Knowledge area”, “Summary”, “Keywords”, “Article text”, “Article owner” and “Review by”.
  4. Press “Save draft” or “Save and send for review”. If you leave “Reviewer” empty, the area’s owner is the default reviewer.
  5. To change a published article press “Revise”.
  6. If something is wrong, press “Report a mistake” on the article.

What you should see

After the reviewer approves, the article appears in the “Published” list. The “Review” tab has the reason for a return or rejection. A draft is kept by itself, and “Restore” is offered when you return.

What can go wrong

  • “Knowledge is not open to your role”: this area takes knowledge read.
  • “Revise” returns the article to draft, and it leaves the published list until approved again.
  • Drafts and archived articles are seen only by their owner, author or reviewer.
  • An article tied to a project is seen only by those who can see that project.
  • “No knowledge areas exist yet”: the PMO or a system administrator must make the areas first.
  • Knowledge home
  • Articles
  • Mistake reports

Portfolio analysis under budget and capacity limits

For: PMO and portfolio manager

PMIS, Analyses: The best set under limits. Open or create an analysis.
The real product - demo data

When you need it

In annual planning, when the budget does not reach every project.

Steps

  1. Open “Portfolio analysis 2026” or press “New analysis”: “Projects in the analysis” and “Cost constraints”.
  2. On the “Cost” tab the limit starts at the budget limit of the analysis’s portfolio. If the portfolio has none, it starts at 70% of the total budget, and the card says so. The slider, “Remove limit” and “Set a limit” change it.
  3. In “Project grid” press “Force in” or “Force out” on a project.
  4. Turn on “Enforce dependencies” if needed.
  5. Read “Bubble chart” and “Efficient frontier”.
  6. The “Resources” tab does the same with role capacity.
  7. To change the analysis, press the “Projects” button, or open “Settings” for “Projects and limits of the analysis”: the projects and “Cost constraints”. This brings the analysis baseline up to date too.

What you should see

On each project, “Why it was left out” with a numeric reason, and “If it were forced in” with the effect on portfolio value. “Strategic alignment” compares each driver’s weight with its share of spend.

What can go wrong

  • “Search longer”: there were many combinations and the search ended before proving the best.
  • A project with no budget counts at zero cost, and a notice says so.
  • A project whose value has no exchange rate is chosen only with “Force in”.
  • The calculation runs in the browser.
  • The first of the “Cost constraints” is the primary one. Budget alone is enough, and the rest are optional.
  • Portfolio analysis
  • Efficient frontier

The command centre

For: Executive and PMO

PMIS, Command centre: What you should know, what needs attention, health, financial performance, plan realisation and project progress.
The real product - demo data

When you need it

In a weekly management review.

Steps

  1. Open “Insights”, “Command centre”.
  2. Read “What you should know”. It is written from the data, and you can open any sentence.
  3. Read the tiles: “Live projects”, “Actual progress”, “Projects behind plan”, “Projects over cost”, “Open risks”, “Open issues”, “Live budget” and “Budget at risk”. Press a number to see the projects behind it.
  4. “Needs attention” ranks projects by how much is wrong, with the reason for each.
  5. See “Health of live projects”. A segment opens its projects, or filters every tab to it with “Filter all dashboards”.
  6. “Financial performance” sets budget, “Planned to date (PV)”, “Earned (EV)” and “Actual cost (AC)” side by side.
  7. “Plan realisation” is actual progress over the progress planned by now, weighted by budget. Its bands are “On plan or ahead (100% or more)”, “Close to plan (90 to 100%)”, “Behind plan (70 to 90%)”, “Far behind (under 70%)” and “Not measured: nothing was planned yet”.
  8. The “Project progress” table gives each project’s “Actual vs plan”, “Deviation (points)”, “Realisation”, “Planned finish” and “Days left”, and opens the project or its Gantt.

What you should see

With demo data, “ERP rollout” and “Production Line 2” show as behind plan or over cost.

What can go wrong

  • If a number looks stale, recalculate the project’s indicators.
  • Amounts with no exchange rate stay out of the total, and a message names them.
  • PV, EV and AC come from KPI readings. Until there is a reading they show a dash.
  • Command centre

Project closure

For: Project manager

PMIS, Closure: The closure checklist, its progress and the closure report.
The real product - demo data

When you need it

When the project is nearing its end.

Steps

  1. On “central warehouse” go to “Plan and knowledge”, “Closure”. “as-built handover” is a sample.
  2. If there is no checklist, press “Create the standard checklist”.
  3. Add a “New item”. Give “Owner”, “Due” and “Done”. For a success criterion, also choose “Knowledge area (success criterion)”.
  4. Press “Closure report” to see plan against actual.
  5. Change the project’s status to closed on the project form, and complete the lessons learned.

What you should see

The “Closure progress” bar shows how many items are done.

What can go wrong

  • The checklist does not stop the project being closed. That check is yours.
  • The standard checklist is offered only when the list is empty.
  • Closure
  • Closure report
  • Lessons

Questions

Does the system work without Project Server?

For: IT manager and PMO

Yes. The system has its own scheduling engine: critical path, constraints, calendars, baselines, assignments, leveling and earned value are computed in the application, in the browser. Data sits in SharePoint lists, and no PWA is needed.

  • If the service is not on the site, “System health” says “Not present; native schedule in use”. System health
  • If your organization has Project Server, a level 5 project has the “Project Server link” view and can read its plan from the server. The link is per project, and no project has to use it. Project Server link
  • This link has never been run against a real Project Server. It has only been tested against a simulator, and the screen says so too. Try it on a test project before relying on it.
  • The site address is the setting “Project Server site address (empty means this site)”, in the “Integration” group. Settings
  • To exchange with MS Project with no server at all, use an XML file. An .mpp file is not read directly. Plan file

How do I change language, calendar and time direction?

For: Everyone

Open “Display settings” from the user menu. Language is Persian or English, and calendar Jalali or Gregorian. The time axis follows the language, and each person can change it for themselves with “Time direction”. These choices do not affect others. Display settings

Why don't I see a tab or button?

For: Everyone

  1. The project’s capability. Its level does not have it. Raise the level, or turn on “Show every tool to me” for yourself. Complexity levels
  2. Your permission. For example “Cost” does not appear without the finance read right. An administrator sees the reason in “Access preview”. Access preview
  3. The project’s stage. A project type can limit tabs per stage.

If organization policy turned the capability off, “Show every tool” does not show it either.

What if two people work at the same time?

For: Planner and project manager

  • Plan: one person is the editor at a time and the rest see it read-only. The lock lapses after a period. Plan lock
  • Record: if someone else changed it after the form opened, a message says so and nothing is overwritten.
  • Document: checking out stops others editing.

Does it work on a phone?

For: Everyone

Yes, in a phone browser. There is no separate app to download, but if the browser offers to install it, you can put the system on your home screen like an app. When the system is opened inside another page, this offer does not appear.

  • On a small screen the rail gives way to a bottom bar with “Today”, “Inbox”, “Projects”, “Tasks” and “Documents”. Today
  • In the Gantt, a “List” and “Chart” switch moves you between the table and the chart. “Columns”, “Views” and “Critical only” are on large screens only. Gantt and WBS
  • The page scrolls down as one. A table or chart wider than the page moves sideways by itself.
  • Installing does not make the system work offline. With no network you see: “You are offline. Nothing can be saved or loaded until the connection returns.”

Why do money totals not match mine?

For: Financial officer and project manager

  • A foreign amount with no rate stays out of a total. The system never counts at a rate of 1, and a notice names the amount. Currency settings
  • The display unit (rial, toman, million) is a setting.
  • Approving a statement posts a cost itself. Posting the same cost by hand counts it twice.
  • The project header’s indicators are stored numbers. Press “Recalculate indicators”.
  • Someone without the finance read right sees less or nothing, and the system stops them writing indicators.

Are Office files edited in the browser?

For: Everyone and IT manager

By default, no. Browser editing is an optional feature that ships turned off, and until an organization sets up an editing server no button for it appears.

Without it (the default):

  • Viewing: PDF, docx, xlsx, pptx, pictures and text show in the built-in viewer. The display is read-only, and complex formatting may not be exact.
  • Editing: “Edit in desktop Office” opens the file in installed Word, Excel or PowerPoint. Saving goes to the library, and PMIS records it as a new revision. An approved or archived document opens read-only in Office. Office must be installed on the computer.
  • Other formats and old doc and xls: press “Download”.
  • Text search: a file’s text is extracted in the browser when registered. For pictures and scanned PDFs OCR runs with “Extract text (OCR)”.

Once it is set up, “Edit in the browser” and “Full view in the browser” appear too. If the editing server does not answer, the built-in viewer and desktop Office remain. Classified documents do not go to it without an explicit setting.

Document detail Browser editing

Why did a reminder or email not arrive?

For: Everyone and system admin

The system has no separate server. Due-date reminders, guarantee expiry, daily indicator readings and sending email are done by any browser that has the system open, about every 30 minutes, with a lock that stops two running together. So:

  • If nobody opens the system, nothing is made or sent until the first person comes.
  • Email is off by default and an administrator must turn it on. With no rule only critical items are emailed.
  • Email goes through SharePoint’s email service, so SharePoint must be configured for it.
  • SMS is not active.
  • Notifications and the inbox refresh every two minutes on an open page.
  • An administrator can press “Run now” under “System health”.

Notifications and rules

How do sign-in and getting a role work?

For: Everyone and IT manager

The system has no sign-in page and opens with your SharePoint account. Sign-in and password policy rest with your infrastructure. A role comes from PMIS group membership and from “Role grants”. Someone with neither is a team member and sees only the projects they are on. Groups and roles

Where is the data stored?

For: IT manager

All data sits in lists prefixed pmis, and files in libraries of the same site. The application connects to no outside address. Setup works only on this site and deletes no data.

  • Backing up the database and SharePoint rests with your infrastructure administrator. Export and restore is not a full server backup.
  • Updating the application replaces its files on the site. For new lists and fields run setup again. Setup

What does the server enforce, and what is only hidden on screen?

For: System admin and IT manager

The server enforces (hard):

  • Sign-in and authentication, which rest with SharePoint and your infrastructure.
  • Read and write rights on the site, lists and libraries.
  • The four document classification levels: each has its own library with its own permissions.
  • A contract’s restricted section, in a separate list with separate permissions.
  • After applying “Server permissions”: finance and timesheet lists for groups without the right, and writing role grants and access rules. It is off by default.

Only the application applies (soft):

  • Which projects a person can read, and Deny on a project.
  • The permission matrix, roles, and roles from groups.
  • Plan locks, approval locks and stage field locks.
  • Timesheet policy, one person’s timesheet from another’s, and hiding resource rates.
  • Tabs hidden by project level.

What it means: rows reach the browser and are filtered there. Someone with read on the site can see them with a direct API call. It is a correct filter for honest users, and it is not a security boundary. Anything whose disclosure would be an incident must sit behind the hard boundaries.

Other limits:

  • The audit log is not tamper-proof on the server, because each user needs write on that list to record their actions.
  • There is no server separation between one project and another.
  • A site collection administrator sees everything.
  • Test the server boundary yourself with a non-admin account.

Soft and hard and Server permissions

What are the data and speed limits?

For: IT manager and PMO

Because calculation is in the browser, the computer and network matter. The limits you will meet:

  • Explore: 5,000 records per report. Cash flow: each table read up to 5,000 rows.
  • Document explorer: about 3,000 documents per view.
  • Tasks: up to 2,000 rows per bucket. Meetings on the calendar: the latest 1,000 meetings.
  • Flow report: the latest 2,000 runs and 5,000 actions.
  • Import from xlsx: 2,000 rows. For more, use csv.
  • Attachments in a full export: 200 MB. The full export itself goes page by page and has no row limit.
  • Dataset export has no row limit, but it is built in the browser, and a daily export can be millions of rows.

Most pages give a message when a result is partial, such as Explore and the flow report. The task list and the meetings calendar do not, so if you cannot find something, narrow the filter. Dataset

Process Studio
On Divan, PMIS's approvals run as its processes.
Cartable
On Divan, what PMIS asks of a person arrives here, beside everything else.
Learning Studio
On Divan, PMIS's lessons are its courses, in Persian and in English.